Naryn BWMO supplies irrigation water to 119.7 thousand hectares of irrigated land. The national state irrigation fund under responsibility of Naryn BWMO is comprised of 685.6 km of inter-farm canals, 814 hydraulic structures, 20 pump stations, 49.3 km of collector-drainage network, and 9 daily runoff ponds, with the useful capacity of 2.84 Mm3.
Naryn BWMO consists of 4 district (rayon) water management divisions. At present, out of 119.7 thousand ha of the province’s irrigated area: • 97.87 thousand ha or 82% are in good condition; • 12.0 thousand ha or 10% are satisfactory; • 9.94 thousand ha or 8% are unsatisfactory.
The list of functions and mandate at the provincial level includes the following: • Organization of operation of the state irrigation and drainage network, canals, diversion, regulating and other hydraulic structures, pump stations, wells, reservoirs, power-supply lines, transforming stations and other elements of the state water infrastructure in order to improve their performance and reduce process water losses. • Construction, reconstruction, and modernization of water-management and nature-protection systems and structures. • Adoption of new automation, telecontrol and water control facilities and measures for their effective application. • Development of draft perspective and annual forecast-plans for efficient water resources use. • Design and survey work for other ministries and departments, according to state orders and through contracts with local authorities, peasant and individual farms, agricultural cooperative and other economic entities. • Organization of development of water-management balances, perspective multipurpose water resources plans for river basins, irrigation systems, rayons and province as a whole. • Control over technical state, use and repair of earth-moving machines, vehicles, and other machinery. • Monitoring over availability of state pump stations, supervision over the state of pump stations and correction of their operation rules, as well as energy management. • Estimation of needs for spare parts for smooth operation of pump stations and pressure pipelines. • Control over implementation of current and capital repairs of pump stations, power equipment, earth-moving machines, vehicles, and mechanisms. • Qualifying evaluation of operating staff from operations department. Lenin str., 188, Naryn, 722600, Kyrgyz Republic Phone: (996 3522) 5 08 67 Fax: (996 3522) 5 19 72
|