Orlov E.V., Komarov A.S., Melnikov F.A., Serov A.E. - Construction of Water Intake Facilities from Partially Drying up Watercourses |
Written by Erkin Turdibaev | |
Thursday, 16 March 2017 | |
Partially ephemeral streams are complex objects that can still be used for water supply or irrigation of agricultural land. The problem of such streams is poorly studied, because the influence of various environmental factors complicates carrying out any experiments. Also it is not possible to make their full classification due to their very strong variability not only on a particular geographical belt, but also within separate areas of the river. All this undoubtedly complicates the task of the designers when designing the system. Creation of laboratory models, allowing us to evaluate the possibilities of a spring use for the purpose of water supply, is very promising. These watercourses have a large amount of suspended sediments, so it is not possible to use the standard scheme of water using of the coastal and fluvial water intake structures. It is proposed to organize the fight with the sediments in the flow chart of primary clarifiers, which will perform the function of settling suspensions, to facilitate the work of water treatment facilities. Also the creation of artificial prop is useful in order to achieve the required level of water in a watercourse for water organization. If under the bottom of the river there is underground water, and the permeability of the soil is good, it is possible to arrange the withdrawal of water through infiltration intakes, by setting the filter under the bottom of the watercourse with its connection to filter, from which the water will climb to submersible pumps. Additional filtration through the soil of the river bottom allows not using the scheme sumps, which significantly reduces the cost of epy incoming water treatment. Download (in Russian) (pdf, 2,1 Mb) Source: http://cyberleninka.ru/ |
< Prev | Next > |
---|